IF
Skip to main content

Oil Manifold Modification β€” Jisike Well-6

Modification of the oil manifold at Jisike Well-6.

Oil Manifold Modification β€” Jisike Well-6

Related projects

Tier-1 operator (name withheld)

Loading Bay and Associated Piping β€” Civil Base Construction

Construction and installation of a loading bay and associated pipework, including the civil base.

End Facilities Fabrication... July 2022
Tier-1 operator (name withheld)

Gas Bottles Fabrication & Installation β€” Wells OHS-3 and OHS-4

Fabrication and installation of four gas bottles serving wells OHS-3 and OHS-4.

End Facilities Fabrication... April 2019
Tier-1 operator (name withheld)

Hook-Up Spools 6" and 4" β€” OHS-4 Manifold

Fabrication and installation of 6-inch and 4-inch hook-up spools at the OHS-4 manifold.

End Facilities Fabrication... March 2019
Have a scope?

Send it to us and get a considered response in one working day

Share your scope of work, drawings or BOQ. You will hear back from an engineer, not a call-centre.