9 projects found
Pipeline Welding — KP 3+454 to KP 5+000 and KP 5+000 to KP 6+5...
Provision of welding for two crew scopes covering kilometre posts 3+454 to 5+000 and 5+000 to 6+500.
Pipeline Welding — KP 0 to KP 1+175 (Land Section)
Provision of welding for the land section of the line, kilometre post 0 to 1+175.
Loading Bay and Associated Piping — Civil Base Construction
Construction and installation of a loading bay and associated pipework, including the civil base.
Oil Manifold Modification — Jisike Well-6
Modification of the oil manifold at Jisike Well-6.
Gas Bottles Fabrication & Installation — Wells OHS-3 and OHS-4
Fabrication and installation of four gas bottles serving wells OHS-3 and OHS-4.
Flowline Construction & Burying — Well OHS-3
Construction and burying of flowlines for well OHS-3.
Flowline Construction & Burying — Well OHS-4
Construction and burying of flowlines for well OHS-4.
Hook-Up Spools 6" and 4" — OHS-4 Manifold
Fabrication and installation of 6-inch and 4-inch hook-up spools at the OHS-4 manifold.
Oil Manifold Fabrication, Testing & Installation — Well OHS-4
Fabrication, testing and installation of the oil manifold at well OHS-4.